Thermal Power Plant

thermalSince, cement manufacturing is a highly power intensive process, in 2009 the company has commissioned a 18 MW Coal based Thermal Captive Power Plant (CPP) within the premises of the cement plant to ensure continuous uninterrupted power supply to the cement plant. The plant was supplied, erected and commissioned by Thermax Limited who is a pioneer in this field. The CPP comprises of a 76 TPH Thermax Brand Atmospheric Fluidized Bed Combustion Boiler (AFBC) and an Impulse & Reaction System Turbine coupled to a 1500 RPM, 18 MW Genrator. The power generated is distributed through a switch yard adjoining the CPP. The fly ash generated from the plant (approximate 150MT) is captively consumed in the manufacture of Portland Pozzolana Cement (PPC).

As an energy saving measure, in 2019, the Company has commissioned 6.31 MW of Waste Heat Recovery System (WHRS) Power Plant to generate energy for its captive use. Further, the Company commissioned 6.50 MW of WHRS Power Plant during expansion of its cement production capacity by adding Line-3 Cement Plant. At present, the total capacity of WHRS Power Plant is 12.81 MW.

At present the total capacity of thermal power plant is 30.81 MW (CPP: 18 MW and WHRS: 12.81 MW).





© 2019 Designed By F-Grade All Rights Reserved

Home | Legal Disclaimer | Privacy Policy | Google+ | Site Map